Fort Worth Duro-Last Roof Installation

Duro-last logoIf you have a flat roof or low-sloped roof, Duro-Last® is the perfect roofing application.  DK Haney Roofing has specialized in installing  Duro-Last® single-ply roofing membrane for 15 years. We are one of the best and top Duro-Last® contractors in the nation, which has earned us our Master Contractor status.

The Duro-Last® roofing system is fire retardant, chemical and grease resistant, can stand up against high winds and punctures, and easily accommodates extreme temperature change. Duro-Last’s custom flashing resists ponding water and prevents roofing problems before they happen. Once installed, a Duro-Last® roof is watertight and virtually maintenance-free. DK Haney Roofing is tops at Duro-Last Roof Installation in Fort Worth.

Long Term Values

  • Save Money with energy efficiency.
  • No Worries with a custom, prefabricated, durable, leak-proof, virtually maintenance-free roof.
  • Feel Protected with industry leading warranties.
  • Have Confidence with the installation by authorized, professional Duro-Last® certified contractors.

The Duro-Last® roofing system is the best long-term investment for your facility. Duro-Last Energy Efficiency

Energy Efficient

Do you want to significantly reduce the energy and cooling costs at your facility? The Duro-Last® white membrane boasts the highest retained reflectivity of any single-ply membrane, rated by the EPA’s ENERGY STAR® Roof Products Program for reflecting 88 percent of the sun’s energy. This translates in a 40 percent decrease in your building’s energy consumption since your HVAC and air conditioning system don’t have to work as hard to keep the facility cool.

Environmentally-Friendly Roofing

Using Duro-Last® roofing helps cut down not only on energy consumption, but it also cuts down on landfill. Once a Duro-Last® roof is at the end of its lifespan, it can easily be recycled and reused for other products, such as flooring.  In fact, Duro-Last® headquarters recycled its 57,600 square foot Duro-Last® roof into 45,700 square feet of flooring.

Duro-Last® roofing membranes also require less energy to manufacture and transport when compared to other roofing materials. And because closed-loop manufacturing is utilized, greenhouse gases and other hazardous emissions are greatly reduced.

Easy Installation

Duro-Last roof installation in Fort Worth is super easy and pain-free. No need to worry about loud noises and safety. A Duro-Last roof can be installed without noisy machinery or hazardous materials. And because a new Duro-Last® roofing system can often be installed over an existing roof without tear-off, there is no need to worry about debris lingering around your business. Every Duro-Last roof is manufactured to exact size in a controlled factory environment. This ensures a long-term protection, an excellent fit and leak-proof seaming.

CBS Studios Before

CBS Studios Before

CBS Studios AFTER with Duro-Last

CBS Studios AFTER with Duro-Last

 

Industry’s Best Warranty

Duro-Last® protects your facilities with either a 15-year full warranty or a 20-year pro-rated warranty. Both are transferable, and both provide maximum protection. They include coverage for consequential damages that result from defects in the Duro-Last® material and/or installation. Contact us today by calling (866) Dry IT IN to find out if a Duro-Last roofing system is the best solution for you.

With a Duro-Last roof, you pay nothing for material or labor for warranted repairs or replacement. And here’s the best part, the warranty is included at no additional charge.